Process
- The stone is firstly crushed by the jaw crusher. Then the material is conveyed to the secondary crushing equipment (impact crusher or cone) by the belt conveyor for secondary crushing.
- The belt conveyor transported the 0-40mm aggregate to the VSI vertical impact crusher machine-made sand. Materials more significant than 10mm return to the VSI machine for crushing again, forming a closed loop.
- 5-10mm material can be partially finished according to the discharge requirements. Materials less than 5mm enter the sand washing machine for cleaning.
- Zhijian provides free solutions to meet different requirements.
-
Note
The cone crusher is used for the crushing equipment of high-hardness material sand making, and the impact crusher is used for the crushing equipment of low-hardness material sand making.